Home/Answers/Standby
GENERATOR COST LAB / Standby

How to Set Up Standby

To set up Standby, confirm the input format/device, choose output settings, then run a small batch.

Updated 2026-11-01About 3 minLocal test
Quick answer

To set up Standby, confirm the input format/device, choose output settings, then run a small batch. Standby depends on power/automation/fuel/install.

Why it matters

Validate on a small sample before running the whole batch.

Power.

Step by step

  1. Calculate power/startup load/fuel/automation/install/permits.
  2. Separate equipment/install/fuel/maintenance/battery.
  3. Get 2-3 quotes; confirm power/install/warranty.
  4. Contract states scope/fuel/permits/payment.

Common mistakes

  • Power only, not startup load/install.
  • Ignoring fuel/permits/maintenance.
  • Portable CO/wiring risks.
  • No warranty/payment terms.

Checklist

  • Power/startup load/fuel/automation.
  • Equipment/install/transfer switch/permits.
  • Fuel/maintenance/noise/emissions.
  • Warranty/payment/contract.
  • Budget/battery/outage.

Key facts

  • Power.
  • Auto.
  • Fuel.

FAQ

How do I set up Standby?

To set up Standby, confirm the input format/device, choose output settings, then run a small batch. Standby depends on power/automation/fuel/install.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: Energy.gov